PLACE KEYWORDS HERE
HomeContact
About Us Services Our Work Links Clearance
Our Work

LRT - West Portal

LRT - West Portal
LRT - West Portal

The Confederation Line project is the first stage in Ottawa’s future light rail network. The 12.5-kilometre electric rail system – which will be completed in 2018 – will replace existing diesel powered buses, providing rapid transit between Blair Station in the east and Tunney’s Pasture Station in the west. The route includes 13 stations and a 2.5-kilometre tunnel that will alleviate congestion through the downtown core.

West Portal ramp shoring and excavation prior to the beginning of tunneling; the portal is one of the O-Train Confederation Line light rail transit (LRT) entrances to/from the tunnel, located just east of Pimisi Station.

Owner: City of Ottawa

General Contractor: OLRT Constructors

Contact Us for more info

We invite you to view our gallery of featured contracts.

Click for more
Join the Dufresne team. Check out current our opportunities.

Click for more


Dufresne Piling Company (1967) Limited.
tel 613 739.5355   fax 613 739.4012

Home| About Us | Our Services | Our Work | Careers | Links | Contact Us | Site Map

© 2006 - 2017 Dufresne Piling Company Ltd . All rights reserved. Legal disclaimer.
Designed & Developed by Envision Online Media Inc.